Gallery

Sperrin Mouldings

Gallery

Completed Throughout Ireland

Examples of Work in Progress

  • A bunch of wooden sticks are stacked on top of each other

    Slide title

    Dargle-2 Moulds packaged and ready to be loaded for delivery proir to going to site for installation.

    Button
  • Two curved pieces of concrete are sitting on top of a wooden table.

    Slide title

    Components for a front door arch prior to installation.

    Button
  • A wooden table with a bunch of pieces of concrete on it.

    Slide title

    Components for a front door arch prior to installation.

    Button
  • A brick building under construction with a lot of windows

    Slide title

    Walmar Windows & Door moulds during installation.

    Button
  • A brick building with a lot of windows is being built.

    Slide title

    Walmar Windows & Door moulds during installation.

    Button
  • A bulldozer is standing in front of a brick building under construction.

    Slide title

    Walmar Windows & Door moulds during installation.

    Button
  • A truck with a stack of concrete blocks in the back

    Slide title

    Walmar Moulds loaded and ready for delivery to site

    Button
Share by: